This scheme has been 18 months in the making as the site is located within a conservation area. Considerable discussions and negotiations were had with both planners and conservation bodies to ensure the scheme met the exacting special design required to have any chance of gaining planning approval. A fresh design utilising traditional materials was utilised to extend the host building which carried over into the new build block to compliment the setting and surrounding area.